Location:
North Afghanistan, Andkhoy town
Activity:
Water Supply
Client:
Ministry of Energy & Water Afghanistan (MEW)
start date:
Completion Date:
Project Description:
Services: Engineering, Procurement and Construction (EPC)
Objective: Water supply of Andkhoy and its suburban villages
Pipe diameters: 140 to 355 mm
Pipe length: 132 km
Pipe material: PE
Transmission rate: 52 lit/sec
No. of pump stations: 3
Concrete reservoirs: 2 of 500 m³, 1 of 12000 m³
Elevated tanks: 4 each 50 m³
Status: Construction
works accomplished